AGO AG | Projects / IGZ Biomed Würzburg

Innovations- und Gründerzentrum (IGZ), Würzburg

AGO AG Energie + Anlagen equipped about 40 laboratories with air conditioning systems including full instrumentation and control technology. The installations in the laboratories were not hidden under a second ceiling. It was instead opted for a visible, low-maintenance installation. The aggregates for ventilation are housed in large basement and roof control systems.

Laboratory: partial air conditioning system

  • Heat output: 440 kW
  • Air volume: 60,000 m³/h
  • Order volume: EUR 450,000
  • Design: Ingenieurbüro abi, Würzburg
  • Client: Besitzgesellschaft IGZ Biomed/ZMK GmbH, München
CHP – Thermal Power Stations | ago congelo | Ventilation and Climate Systems | Process Cooling
SCP