Molkerei Gropper

HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

Installation of a CHP, exhaust gas steam generator and heat exchanger, absorption chiller with NH3 -8°C, lube oil system, noise reducing enclosure, exhaust silencer and switchgear with superordinate control. Assembly on site, commissioning and trial operation.

1st construction stage

  • Thermal capacity 2,48 MW
  • Electrical capacity: 2,15 MW
  • Steam output: 1,5 to/h / 12,0 bar
  • cooling via ago congelo® NH3 / H2O-absorber 500 KW

2nd construction stage

  • Thermal capacity: 2,28 MW
  • Electrical capacity: 2,14 MW
  • Steam capacity: 1,5 to/h
  • cooling via ago congelo® NH3 / H2O-absorber 500 KW