Sparkasse, Schweinfurt

During extensive reconstruction work,s the main hall and counseling rooms of the bank were furnished with combined heating and cooling ceilings for the supply of warm and cold air. A special challenge was the adjustment of the technical installation to the filigree interior design specification. Also in this case, the experts of AGO AG Energie + Anlagen were extremely flexible.

Office building, installation of a comfort air conditioning system and heating and cooling ceilings in the main hall and office rooms

  • Heat output: approximately 125 kW
  • Refrigeration output: approximately 75 kW
  • Air flow: about 29,000 m³/ h
  • Order volume: EUR 460,000
  • Design: AGO AG Energie + Anlagen
  • Client: Sparkasse Schweinfurt
CHP – Thermal Power Stations | ago congelo | Ventilation and Climate Systems | Process Cooling