Spitzenheizwerk HWE4 Schwerin Lankow
(peak load heating plant)
AGO AG Energie + Anlagen as general contractor was responsible for the construction of a peak load heating plant with a performance of 50 MW generated by water-tube boiler. Scope of delivery of the general contractor included the boiler house, including building construction, electrical equipment, district heat transfer as well as the completion of the outdoor facilities.
Boiler house complete including oil and gas supply, electricity supply of the building and smoke stack
- Boiler output: 50 MW
- Construction period: March 2001 – October 2001
- Order volume: € million 3.78
- Design: BLS Energieplan GmbH, Berlin
- Client: Stadtwerke Schwerin