ZF Sachs, Eitorf

The entire heating network for production and administration of the damper factory was fully renewed without any interruptions of operations. As part of the project, two new warm water heating boiler including safety-related equipment and smoke stack systems were installed in the factory. The in-plant transmission station and the heat consumers were converted from hot water (at 180°C) to warm water and achieved hence an increase of energy efficiency and profitability of the whole installation engineering.

Exchange of hot water boiler, conversion and optimization of the consumers from hot water to heat pump warm water

  • Boiler output: 2 × 4,000 kW
  • Order volume: EUR 800,000
  • Design: AGO AG Energie + Anlagen
  • Client: ZF Sachs AG Schweinfurt