The new combined heat and power plant supplies the city of 100,000 residents with power and hot water. A Greek company designed the building and the boiler plant, currently with 75 MW (final stage approximately 115 MW). AGO installed the complete gas engine plant with Deutz engines, including the entire electrical engineering, medium voltage system, and SCADA system.
- Electric power: 4 × 4,006 kW at 11 kV
- Thermal output: 4 × 4,239 kW
- Fuel capacity: 4 × 9,566 kW
- Order volume: € million 9.20
- Design: AGO AG Energie + Anlagen
- Client: Thermie Serres S.A.