EVC Center, Dresden

HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

Barely twelve months passed between the order confirmation to AGO AG until the implementation of the new Energy Center II in Dresden. This is a record-breaking time considering that all tender procedures and construction designs for the project in the value of 22 million€ as well as all installation work was carried out.

Hot water heating facility with thermal power station and heat exchangers operated by natural gas and heated with 10 bar saturated steam from gas engines and steam boilers.

Technical data:
  • Maximum allowable operating pressure: 16 bar
  • Heat network: 32°C and 54°C
  • 9 gas engines with 2,560 kW each = 23.0 MW / hot water
  • 3 heat exchangers with 5,000 kW each = 15.0 MW / hot water
  • Refrigeration for a chip factory
  • Cold water temperature 5°C and 11°C
  • 5 turbo chillers with 5,900 kW each = 29.5 MW
  • 3 double effect absorption chillers 5,800 kW each = 17.4 MW
  • 2 single effect absorption chillers 3,200 kW each = 6.4 MW
  • Heat recovery from cooling water at 24.0 MW
  • 14 cooling towers with 6.5 MW each = 91.0 MW
  • Design: AGO