HeatCoolingPowerVentilationThermal TechnologyCongeloCalformaNewsEventMedia

An energy centre for the district administration and a hotel complex were newly built on the Karl Kurz site. The contract included the installation of a hot water boiler with a CHP connection, integration of the buffer tanks and the district heating pump station. For the cooling supply a split refrigeration machine with reserve space, the integration of the cold water buffer storage and the district cooling pump station were installed.

Image

Technical data:

  • Heat capacity: 3,0 MW
  • Cooling capacity: 700 kW